Greenhouse Cost: Build a Budget for the Whole Project

Budget for a backyard greenhouse using dated kit examples, site work, installation, equipment and operating costs without confusing a package price with a finished project.

By GardenHelmPublished 7-minute readMore in Freestanding Greenhouses

Small framed greenhouse among garden plants with bird feeders in the foreground
greenhouse by peganum / CC BY-SA 2.0. Cropped and resized.
In this guide
  1. What listings actually show
  2. The five things that drive the total
  3. Estimating electricity
  4. Splitting the first season from later upgrades
  5. Running costs beyond power
  6. Comparing quotes
  7. Retailers

We may earn a commission from links on this page, at no extra cost to you. How this works

Ask one question before pricing anything: do you need this greenhouse warm in January, or just sheltered in April? That answer moves the total more than the brand you pick. A spring seedling house needs a sound structure, a vent and a bench. A winter growing house adds heat, power, often water, and a better-insulated shell, and every one of those pulls in site work and running costs that never appear on a kit’s price tag.

So think in two totals: what it costs to get the greenhouse ready for plants, and what it costs each year to run.

What listings actually show

Two examples, checked on October 28, 2026, show how wide the gap is between a package price and a project. They are not a national price range, a ranking or installed quotes.

Listing Price displayed when checked Important limit
VEIKOUS aluminum and polycarbonate greenhouse, selected 6-by-8 option $419.99 The selected option was Sold Out; the listing offers other configurations
Bloomcabin Aluminum Classic greenhouse collection entry From $5,557.18 A collection starting price, not a quote for a specified size with installation

Recheck the VEIKOUS product listing and Bloomcabin collection before ordering, since a “from” price may describe a smaller or simpler configuration than the photo shows. Neither figure includes the base, delivery to your actual spot, assembly, utilities or tax unless the listing says so. GardenHelm may earn a commission if you buy through the retailer links on this page, at no extra cost to you; product details here come from the sellers’ own pages.

The two listings also price two different projects. The VEIKOUS kit is a polycarbonate walk-in house in five sizes from 6 by 8 to 8 by 16 feet, with one adjustable vent window on the 8- and 10-foot lengths and two on the longer ones. Its door on the 6-foot-wide sizes is 24.4 inches wide, so measure your wheelbarrow against it. VEIKOUS recommends a tie-down kit for wind resistance and says the kit ships in two packages that may not arrive together: put anchoring and a second delivery check on the budget. For the April seedling house, a kit of this class on a level, anchored base, plus a bench, is the core of the first-season spend; delivery and tax still sit on top. VEIKOUS says its thicker sheets help avoid frost damage, but a house kept warm in January still needs the heat and power lines in section 5 on top of the kit.

The Bloomcabin figure is the floor of a configurable range. Its Aluminum Greenhouse page lists 22 size configurations from 40.6 to 302.3 square feet, roof and side glazing chosen separately from polycarbonate and several glass types, including 0.16-inch tempered glass, and a heater with a chimney outlet as an optional accessory; for the colder months it recommends 0.16-inch insulated glazing. Delivery in the continental US is listed as free, while professional installation is recommended but not priced. Each of those options moves the total away from the entry figure. That spending makes sense for a heated winter house or a glass room you will sit in; for spring seedlings it buys capacity you will not use.

The five things that drive the total

1. Size

Floor area multiplies almost everything else: frame, glazing, foundation, heating load. University of Georgia Extension’s hobby-greenhouse guide nonetheless suggests buying 25 to 50% more space than you first plan, because collections grow. The way to square that with a budget is to pay for the floor area you will really fill and keep the extras (automation, fancy shelving) for later.

2. Glazing and frame

Film is the cheapest covering but needs replacing every few years; glass is the most expensive and heaviest; polycarbonate sits between. The UGA bulletin says construction cost per square foot for a plastic-covered greenhouse is generally one-sixth to one-tenth that of a glass greenhouse. That is an older publication’s ratio, useful for direction, not a current quote. A heavier frame rated for your snow and wind adds cost too, and is the last place to economize in an exposed or snowy yard.

3. Site and foundation

Get the maker’s foundation drawings before asking anyone to price site work. A level, well-drained spot with good access is the cheap case; a slope, wet ground or a long carry from the street can add grading, drainage, a footing or extra labor. Permits, setbacks and utility locating depend on your jurisdiction, so ask the local authority about your actual plan rather than assuming a small footprint is exempt.

Give delivery its own line. Curbside freight, help unloading and moving long crates through a narrow side gate are three different services, so measure the route and ask for package sizes and weights.

4. Assembly

Ask what an assembly quote covers: checking the base, glazing, fitting doors and vents, sealing, removing packaging and adjusting moving parts. Find out who pays for a second visit if a part is missing or damaged. If you build it yourself, cost the tools you do not own, a helper and the time the manual’s steps will take, and read the manual before deciding.

5. Season, heat and utilities

This is where winter growing gets expensive. UGA notes that night temperatures of 55 to 65°F suit most greenhouse plants, so a lower setpoint is one of the few running costs you control directly. It also warns that electric heat can be very costly and is usually used only in very small greenhouses. Power for heaters, fans or lights, and a water supply, mean trenching and installation work as well as the appliances; UGA recommends having plumbing and electrical work done by professionals to local codes. Plan permanent service rather than a long extension cord.

Estimating electricity

The arithmetic is kilowatts × hours running × your electricity rate. Virginia Cooperative Extension walks through the same method using watts divided by 1,000 (energy-use calculation). As a pure example, a 1.5-kilowatt heater drawing full power for four hours uses 6 kilowatt-hours; at an assumed $0.20 per kWh that is $1.20. Use your own utility rate and the equipment’s actual draw, and remember that a thermostat cycles a heater on and off, so hours plugged in are not hours at full power.

That formula tells you what a device costs to run. It does not tell you how big a heater you need, which depends on the structure, covering, outdoor lows and the temperature you want inside. Have the heating equipment sized for the actual project.

Splitting the first season from later upgrades

Phase the project in this order:

Stage Done when
Ready for delivery The site is accessible and the required base is complete
Ready for plants Ventilation, watering and benches work
Ready for the chosen season Equipment can hold the conditions the plants need
Future improvements Compatibility and installation access are confirmed

Defer only what can really be added later. Conduit for buried power, foundation provisions for a future extension and an automatic opener that fits the vent are worth settling before assembly, even if you buy them next year. Vent openers show why: on Bloomcabin’s aluminum greenhouse, manual roof-window openers come as standard and two automatic opener types are offered as upgrades. If nobody is home on summer afternoons, price the automatic version into the first order.

Running costs beyond power

Keep an annual line for cleaning supplies, irrigation parts and small repairs, and a reserve for bigger items such as replacement panels, seals and door hardware. Find out how the maker identifies and supplies those parts. In the first year, record electricity separately from seeds, pots and potting mix so you can see what the structure itself costs to run; that record beats any online average for planning year two.

Comparing quotes

Send every supplier the same brief: footprint, location, growing season and equipment. Ask for exclusions in writing. If the total is too high, change the brief on purpose by shrinking the footprint, shortening the season or postponing automation. Cutting required foundation or installation work to make a quote fit is the one saving that tends to cost more later.

Building from scratch is not automatically cheaper either. Savings depend on the design, materials, tools and your time, so price a complete, documented plan against a kit of similar size before deciding. The greenhouse hub covers the other decisions that shape the specification.

Retailers to browse

Compare sizes, materials and delivery details on each retailer’s current listings.

Written from manufacturer and retailer information and general garden practice. GardenHelm has not physically tested the products discussed here. How we choose products